Euromedia24 on Play Store Euromedia24 on App Sore
BNB

$870.47

BTC

$113082

ADA

$0.868816

ETH

$4608.63

SOL

$213.76

31 °

Yerevan

20 °

Moscow

45 °

Dubai

20 °

London

26 °

Beijing

23 °

Brussels

16 °

Rome

23 °

Madrid

BNB

$870.47

BTC

$113082

ADA

$0.868816

ETH

$4608.63

SOL

$213.76

31 °

Yerevan

20 °

Moscow

45 °

Dubai

20 °

London

26 °

Beijing

23 °

Brussels

16 °

Rome

23 °

Madrid

There will be no gas on September 22, 24, 25, 26. Addresses:


For planned work on September 22, from 10:00 to September 23, the gas consumers of Gogher of Number 10, 14, 16, 18, and the gas consumers of the Kanaker-Zeytun administrative district of Gogol Street will be stopped. Gas supply.

 
In order to carry out scheduled work on September 22, from 10:00 to September 23, 80, 82, 8,8, 3, 3, 3, 7, 8, and Multi-Multi-Multi-Multi-Multi-Multi-Multi-Multi-Sarakyan Street No. Gas supporters of buildings, Tsererian, Manukyan, Mamikonyan streets 1 Gas gas consumers of gas consumers.
In order to carry out scheduled work on September 26, from 09:00 to 18:00, gas supply to the Gas Assists of the Arjut settlement of Lori region will be suspended.

In order to carry out scheduled work, on September 26, from 10:00 to 18:00, gas supply to the gas consumers and related public organizations of various importance of various importance of Darakert settlement of Ararat region will be suspended.

 
Scheduled work (Goris GBC Capital Repair) From 09.00 to September 26 at 21:00, Goris, Karahunj, Verishen, Akn, Grass, Shinchir LLC, Aght Stone Gaz LLC, "Best" ROOD LLC (asphalt factory), Elola CJSC (dairy production), gas supply of "Fat" LLC (Bread Production), other public organizations of other public organizations operating in the mentioned settlements.
 
In order to carry out winter preparatory, planned prophylactic and repair, from 09:30 to September 25, the 2nd Mass of Nor Nork administrative district of Yerevan will be suspended from Nork 2nd Massion (32/4 apartment buildings and private houses), 3rd and 4th blocks of Nork. Gas supporters gas supply.

In order to carry out scheduled work on September 24, from 10:00 to 17:00, gas supply to the Shengavit streets of Yerevan, Bagratunyats streets and the 2nd public enterprises of the district of Bagratunyats, will be suspended.

News

Iran intends to fight "until the last drop of blood". The political forces presented the documents to the CEC (video)
Scientists have identified types of exercise that can protect against chronic stress
Pashinyan deceives the public by claiming that the church does not pay taxes. Lord Vrtanea (video)
DIRECTLY: The court hearing in the case of Edgar Ghazaryan
Urgent
Emergency calls from Byureghavan do not stop. Armen Vardumyan
Important
Demolition of Stepanakert church is an example of slow genocide (video)
Scientists have found that raspberries protect the body from inflammatory diseases
CP member Gulnazaryan became active. What property does the deputy candidate have? "People"
"Iravunk": "If I put humanity aside, I will pulverize the CP, but Pashinyan is in the middle." What is Hayk Sargsyan upset about?
"Publication". The campaign against the Church continues
"Publication". Nikol Pashinyan has decided to break Gyumri's resistance
"Publication". Karapetyan made some edits to the list
Courts have given thousands of permissions to read private SMS. alarming numbers. "People"
What fate awaits HETC? until when Romanos Petrosyan will lead the National People's Congress. "People"
You don't know Pashinyan well, if he is re-elected on June 7, he will do dry cleaning. political scientist (video)
The Azerbaijani supply of "Metsahog" is a sign of peace, and the destruction of the Stepanakert Cathedral is not seen as a sign of an impending disaster. Arman Abovyan
The 17-year-old TikTok star was killed
Meeting of RA Foreign Minister with NATO representative
The body of a foreigner was found in one of the houses in Nor Aresh
Malkhas Amoyan became a five-time European champion