As a result of the impact of the vehicle, the low-pressure above-ground gas pipeline was damaged, due to which, on January 8, at 3:30 p.m., the gas supply to the gas consumers of Aigavan settlement of Ararat marz was stopped.
As reported by "Gazprom Armenia" CJSC, the expected time of gas supply restoration is 18:00.








