Euromedia24 on Play Store Euromedia24 on App Sore
BNB

$870.47

BTC

$113082

ADA

$0.868816

ETH

$4608.63

SOL

$213.76

31 °

Yerevan

20 °

Moscow

45 °

Dubai

20 °

London

26 °

Beijing

23 °

Brussels

16 °

Rome

23 °

Madrid

BNB

$870.47

BTC

$113082

ADA

$0.868816

ETH

$4608.63

SOL

$213.76

31 °

Yerevan

20 °

Moscow

45 °

Dubai

20 °

London

26 °

Beijing

23 °

Brussels

16 °

Rome

23 °

Madrid

On October 23, 24, 27, 28, 30, there will be no gas in hundreds of addresses


In order to carry out preparatory and planned works for winter, on October 24 from 10:00 a.m. to 6:00 p.m., the gas supply to gas consumers in Nazarbekyan G-1 and Silikyan districts of Ajapnyak administrative district of Yerevan city will be stopped.


In order to connect the newly built gas pipeline to the existing gas pipeline, on October 24 from 10:00 a.m. to 5:00 p.m., the gas supply to the gas consumers of Haytagh, Geghakert, Aratashen, Aknalich, Arshaluys, Shahumyan, Dasht, Monteavan, Aygeshat, Amberd settlements of Armavir marz will be stopped.
 

In order to carry out planned works, on October 24 from 10:00 to 20:00, the gas supply to (partial) gas consumers of Artashat city, Ararat region, and related public organizations of various purposes will be stopped.


In order to carry out planned works, on October 23 from 10:00 to 18:00, the gas supply to the (partial) gas consumers of the Nor Kharberd settlement of Ararat region, as well as to related public organizations of various purposes, will be stopped.


In order to carry out preparatory and planning works for the winter, on October 23 from 10:00 to 18:00, Charentsi, M. of Kentron administrative district of Yerevan city will be closed. Chailakhyan, G. Jahukyan, the gas supply of the gas consumers of the district surrounded by the streets of Heroomart of Van, and the related public organizations of various significance.


In order to connect the newly built gas pipeline to the existing gas pipeline, on October 23 from 10:00 a.m. to 5:00 p.m., gas consumers of Artashar, Zartonk, Yeghegnut, Arazap, Vardanashen, Yeraskhahun, Margara settlements of Metsamor community of Armavir marz, Yeghegnut LLC poultry factory will be closed. "Margaryan and friends" Gas supply of CNG, "VAHAGNAV" LLC CNG, and owner Armen Aramyan's greenhouse economy.
In order to carry out planned repair works, from 09:00 on October 30 to 21:00 on October 31, gas consumers of "Astron", "A-TEG", "VV-Gas" in Teghut, Haghartsin, Gosh, Khachartsin, Aghavnavank, Hovk settlements of Dilijan, Tavush marz will be stopped. CNG plants of "Goshgaz" LLCs, "Dilijan Health Center" CJSC, Creative House of Dilijan Composers, Dilijan No. 1, 2, 3, 4, 6 and Haghartsni and Teghut Kindergartens, "Dili" LLC, "IR-WING" LLC, Ministry of Internal Affairs of Dilijan, "Paradise Hotel" LLC, Simonyan Educational Foundation, All of RA Central Bureau of Investigation Dilijan structures, all structures of Dilijan International School, "Vila Rest House" LLC, "DG-H Partners German JV" LLC, "Tufenkian Hospitality" LLC, "Return-1" LLC, "Katsarans" LLC, "Hayk and Raphael" LLC, "Dili Town" LLC, "Ani" The gas supply of Plaza Hotel LLC, Greenwood Residence LLC, Movsesyan and Partners Development LLC, and other public organizations of various significance operating in the mentioned settlements.
 

In order to carry out planned works (capital repair of the DN700 main gas pipeline "Vanadzor-Alaverdi"), from 09:00 on October 30 to 21:00 on October 31, Tumanyan city, Aygehat (Danushavan), Odzun, Amoj, Karmir Aghek, Lorut, Marts, Arevaatsag, Lori marz will be stopped. Ardvi, Hagvi, Dsegh, Gas supply to gas consumers of Mgart, Tsater, Karinj, Chkalov, Debed, Dzoragetavan settlements, the hotel complex of "Tufenkyan" LLC, "AMART Kentron" LLC, CNG plants of "Sargis", "Dzaghidzor" LLCs, and other public organizations of various significance operating in the said settlements.
 

In order to carry out the re-installation of the gas pipeline, on October 30 from 09:00 to 18:00, the gas supply to the gas consumers of Vardanants and Azatamartiki streets of Vanadzor city, Lori marz will be stopped.
 

In order to carry out planned works (capital repair of the DN500 diameter highway gas pipeline Armavir-Karmrashen), from 09:00 on October 29 to 21:00 on October 30, gas consumers of Dalarik, Lernagog, Karakert settlements of Armavir marz, "Norapat", "RM Plaza", will be stopped. CNG plants of "Godavar" LLCs, "Yerevan Marmalade Industries" LLC, "Ijevan Wine, Brandy Factory" CJSC, "Kotayk CSHSH" LLC, "Karakert Stone Smelting Factory" JSC, "Edgar and Vanush Hovhannisyan" LLC, owner Rostam Sadoyan, owner Kajik Mnatsakanyan, owner Hovik Asatryan, owner Arthur Keyan, owner of Samvel Matsakyan, Kindergartens No. 1 and 2 of Karakert, HASE named after Grigor Narekatsi. center of spiritual culture, H. of Dalarik. after Hovhannisyan gas supply of secondary school No. 1, other public organizations of various significance operating in the mentioned settlements.


In order to carry out planned works (ongoing repair of the "Ayrum" measuring junction), from 09:00 on October 29 to 21:00 on October 30, Noyemberyan, Ayrum, Koghb, Berdavan, Lchkadzor, Bagratashen, Ptghavan, Deghdzavan, Tavush marz will be stopped. Debedavan, gas consumers of Archis settlements, Lori Gas consumers of Shnogh region, Teghut settlements, CNG plants of "Gazardi", "Zeus", "Kayton", "Debit-1", "Debit-2", "Spets" LLCs, "Masis Tobacco" LLC, "Levon 2" LLC, "Hovsep-Narek" LLC, "South Caucasus Railway" CJSC, Bagratashen Customs House, "Platin" LLC, "Zeolite Pro" CJSC, "Tumanyan's Chemical Industry" JSC, "Ararat Gishyan" PJSC, "Greta Barseghyan" PJSC, "Rima Vardumyan" PJSC, "Naira Aleksanyan" PJSC, owner Mekhak Harutyunyan, owner Arpine Gishyan, owner Edik Harutyunyan, the gas supply of other public organizations of various significance operating in the mentioned settlements.
 

In order to carry out preparatory and planned works for the winter, on October 29 from 09:30 to 20:00, the gas supply to the apartment buildings of the 6th block of Nork in the Nor Nork administrative district of Yerevan, gas consumers of adjacent private houses and related public organizations of various purposes will be stopped.
 

In order to carry out preparatory and planned works for winter, on October 29 from 10:00 to 18:00, the gas supply to the gas consumers of the district surrounded by Tumanyan, Abovyan, Pushkini streets and North Avenue of the Kentron administrative district of Yerevan city, as well as to related public organizations of various purposes, will be stopped.
 

In order to carry out planned works, on October 28 from 10:00 to 18:00, the gas supply to the gas consumers of the city of Meghri, Syunik marz will be stopped.
 

In order to carry out planned works ("Sevan-Gavar" DN500 highway gas pipeline repair) from 09:00 on October 28 to 21:00 on October 29, Gavar city of Gegharkunik marz, as well as Hatsarat and Artsvakar districts, Gegharkunik, Lanjaghbyur, Sarukhan, Gandzak, will be closed. Karmirgyugh, Tsaghkashen, Noratus, Ayrivan, Gas consumers of Lchap, Berdkunk, Tsovazar settlements, gas consumers of Martuni city, Vaghashen, Asthadzor, Zolakar, Tsovinar, Vardenik, Artsvanist, Geghhovit, Madina, Nerkin Getashen, Verin Getashen, Lichk, Tsakkar, Tsovasar, Dzoragyugh, Vardadzor, Yeranos, Lernakert settlements, Vardenis of the city, Khachaghbyur, Lusakunk, gas consumers of Tsovak, Karchaghbyur, Akunk, Mets Masrik, Lchavan, Makenis, Shatjrek, Sotk, Vanevan, Torfavan settlements, "Island Fruit", "Gavartrans", "Arm", "Hayk and Norik", "Nor Bagrevand", "Mart Gas", "Makvich", "Goga-Seda" LLCs operating in the mentioned settlements different meaning gas supply of public organizations.
 

In order to carry out preparatory and planning works for the winter, from October 28 at 09:30 to October 29 at 15:00, Grigor and Sargis Gurzadyan, Suvorov, Loris Melikyan, Belinsky streets (partially), Tigran Metsi avenue number 40 to 76, lane number of the Erebuni administrative district of Yerevan will be closed. 2 to 58 apartment buildings and adjacent private houses, private houses at addresses No. 47 to 84 on Bernakirneri Street, apartment buildings No. 13 on Sasuntsi Davti Street, private houses at addresses No. 1 to 49a, apartment buildings No. 2a, 6, 19, 21, 23 on Glinka Street, private houses on Glinka Lane, 1st Lane, 14, 14/1, 14/2, 16, 18, 1st lane of Achemyan Street apartment buildings No. 4/5, private houses at Achemyan Street No. 1 to 131 and Achemyan Dead End No. 4 to 21/1, apartment buildings No. 6, 28, 29, 30, 35 of Yerkatzhysi Street, private houses of the 4th barracks of Yerkatzhysi Street, apartment buildings on Michurini Street and private houses, Vormnadirneri street, lane and rows of private houses, Khorenatsi street no. 209, 211 multi-apartment buildings, private houses at addresses No. 161 to 239, multi-apartment building No. 67 on the 7th street of Sari Tagh district, private houses on the lane from No. 1 to 28th street, from No. 3/2 to 25 of the 1st row of Sari Tagh district, from No. 31 to No. 2 of the 2nd row 36, from number 1 of the 3rd row to 84, from number 1 of the 5th row to 155/4, from 2 to 160 of the 6th row, from 1 to 10 of the 7th row, from 1 to 135 of the 8th row, from 4 to 230 of the 9th row, from 1 to 155/4 of the 10th row, to addresses No. 83/11, 91/25 of Davit Beki street gas supply of gas consumers of private houses, related public organizations of various significance.
 

In order to carry out planning works, from 09:30 on October 28 to 21:00 on October 29, the roads of A. Khachatryan Street No. 15, 17, 19, Vagharshyan Street No. 26, Papazyan Street No. 25, 26, 27, 27/1, 29, Emini of Arabkir Administrative District of Yerevan will be closed. 82, 92/1, 92/2 of the street, apartment buildings of the Riga street 126, as well as the gas supply of private houses from 58 to 127 of Emini Street, 36 to 113 of Manushyan Street, 32 to 106 of Aygektsu Street, and related public organizations of various significance.
 

In order to carry out preparatory and planning works for the winter, on October 28 from 09:30 to 20:00, the number of apartment buildings and adjacent private houses on G. Hovsepyan Street No. 24/30, 24/33, 56/6, 56/7, 24/3, 24/2 of Nork-Marash administrative district of Yerevan will be closed. of apartment building No. 116/4 on 7th Street and adjacent private houses, Davit Gas supply to gas consumers of (partial) private houses on Beki Street.
 

In order to carry out preparatory and planned works for the winter, on October 28 from 10:30 to 19:00, the gas supply to gas consumers on the 1st and 2nd streets of Botanical, Eminescu, Radishchev, Kanaker-Zeytun administrative district of Yerevan city will be stopped.
 

In order to carry out planned works, on October 28 from 09:30 to 19:00, the gas supply to the gas consumers of the district surrounded by Ulnetsu, Babayan, Azatutyan, Varshavyan, A. Tigranyan, Vrtanes Papazyan streets of the Kanaker-Zeytun administrative district of Yerevan city, and related public organizations of various purposes will be stopped.


In order to carry out planned works, on October 28 from 10:00 a.m. to 6:00 p.m., gas supply to gas consumers on Charents and Kostanyan streets of Hrazdan city, Kotayk region will be stopped.
 

In order to carry out planned repair works, from 09:00 on October 27 to 21:00 on October 28, gas consumers of Shaghat, Balak, Angeghakot, Mutsk, Sarnakunk, Tsghuk, Gorayk, Spandarian settlements of Syunik region, "Norash", "S.K. Gas supply of CNG plants of "Kaz" LLCs, "Borisovka" LLC, other public organizations of various significance operating in the mentioned settlements.
 

In order to carry out preparatory and planning works for winter, on October 27 from 09:00 to 21:00, Charentsi, M. of Kentron administrative district of Yerevan will be closed. Chailakhyan, G. Jahukyan, the gas supply of the gas consumers of the district surrounded by the streets of Heroomart of Van, and the related public organizations of various significance.

News

The Diocese of Aragatsotni invites you to a service to pray for the imprisoned Holy Father
Armenian lavash is included in the list of "50 best breads in the world".
There will be no light. addresses
SRC revealed a smuggling scheme (video)
Will it rain? what kind of weather to expect in the coming days?
In the atmospheric air of which RA cities, the dust content has exceeded the permissible limit concentration
On October 23, 24, 27, 28, 30, there will be no gas in hundreds of addresses
Collect water. there will be no water
Aram I and the Prime Minister of Canada discussed a number of issues
The Kremlin commented on Putin's participation in the G20. Putin and Trump do not want to waste time (video)
An ordained clergyman cannot perform a ceremony. There are military exercises in Azerbaijan (video)
The EU will ensure the meeting between Putin and Trump. Lithuania closed the border with Belarus (video)
Important
A public criminal prosecution was initiated against 29 persons in connection with the Gyumri incidents
The police revealed a case of sale of narcotics and psychotropic pills
Leningradyan Street will be renamed after Kirk Kerkorian and will be called "Kirk Kerkorian Street"
After the clashes in Gyumri, 4 citizens have been charged and are expected to be arrested
Major accident in Vanadzor. 3 minors were taken to the hospital
Valuable trees were cut down
Qatar has accused Israel of violating the ceasefire. The date of the meeting between Putin and Trump is not known. Peskov (video)
The criminal police found psychotropic pills in the possession of a foreign citizen

More News

...

The Diocese of Aragatsotni invites you to a service to pray for the imprisoned Holy Father

Armenian lavash is included in the list of "50 best breads in the world".

There will be no light. addresses

SRC revealed a smuggling scheme (video)

Will it rain? what kind of weather to expect in the coming days?

In the atmospheric air of which RA cities, the dust content has exceeded the permissible limit concentration

Collect water. there will be no water

Aram I and the Prime Minister of Canada discussed a number of issues

The Kremlin commented on Putin's participation in the G20. Putin and Trump do not want to waste time (video)

An ordained clergyman cannot perform a ceremony. There are military exercises in Azerbaijan (video)

The EU will ensure the meeting between Putin and Trump. Lithuania closed the border with Belarus (video)

A public criminal prosecution was initiated against 29 persons in connection with the Gyumri incidents

The police revealed a case of sale of narcotics and psychotropic pills

Leningradyan Street will be renamed after Kirk Kerkorian and will be called "Kirk Kerkorian Street"

After the clashes in Gyumri, 4 citizens have been charged and are expected to be arrested

Major accident in Vanadzor. 3 minors were taken to the hospital

Valuable trees were cut down

Qatar has accused Israel of violating the ceasefire. The date of the meeting between Putin and Trump is not known. Peskov (video)

The criminal police found psychotropic pills in the possession of a foreign citizen

The US vice president arrived in Israel on a visit. The European Union is discussing the banning of ethyl alcohol (video)