"The metro is already functioning normally. The movement has been completely restored," Metropoliten informs.
Earlier, we informed that the train that arrived from Garegin Nzhdeh station to Sasuntsi Davit station was not moving for a long time, as a result of which there was an accumulation of passengers at the station. It was reported from the metro that there was a power drop, as a result of which a technical problem arose.
Let's remind that on October 23, a technical problem occurred in the Metro, the normal movement of trains was disrupted.








